What sits under a driveway decides how it copes with the frost.
Resin bound, block paving, tarmac and gravel compared, with the sub-base and drainage that hold them through winter.
Frost and heavy rain show up every weak point in a driveway, from sunken blocks to puddles. Resin bound driveways in Lincoln are often the first replacement people look at, so the question is how resin compares with block paving.
This guide compares resin, block paving, tarmac and gravel through a Lincolnshire winter. It also covers the build, drainage, planning rules, repairs and what to ask before a new driveway goes in.
THE SHORT VERSION
- Every driveway lasts as long as the sub-base and drainage underneath it.
- Resin bound is permeable, so rainwater drains through the surface into the base.
- Block paving carries heavy use, and we can lift and relay it in sections.
- Tarmac suits long drives, while gravel is the simplest permeable surface.
- Resin needs dry weather, so we plan winter installs around the forecast.
ON THIS PAGE
- The quick answer
- What winter does to a driveway
- How resin bound driveways in Lincoln are built
- Resin, block paving, tarmac or gravel
- Resin bonded, gravel and drainage channels
- Planning rules and dropped kerbs
- Repairing a winter-damaged driveway
- What to ask before a new driveway goes in
- Frequently asked questions
- Areas we cover
- Book your free site visit
The Quick Answer
Resin bound and block paving both stand up to a Lincolnshire winter, as long as the sub-base and drainage underneath are built correctly. Resin bound drains through the surface with no joints for frost to open, while we can relay block paving in sections. We lay resin bound driveways in Lincoln, Gainsborough, Scunthorpe, Sleaford and across Lincolnshire, along with block paving, tarmac and gravel.
What Winter Does to a Driveway
Water does the damage in winter, because it freezes, expands and lifts whatever sits above it.
WHAT WE FIND AFTER A HARD WINTER
Can Resin Driveways Be Laid in Winter?
We can lay resin in winter, but only on dry days above the temperature the resin maker sets. Frost, rain or a damp base all stop the resin curing correctly, so we plan winter installs around the forecast.
Block paving and gravel can go down in most winter weather. However, we do not lay any surface on frozen or waterlogged ground, because it settles once the ground thaws.
How Resin Bound Driveways in Lincoln Are Built
These are the stages we follow when laying resin bound driveways in Lincoln and across the county. Most of the work happens before we mix any resin.
Survey the site
We check the levels, drainage, access and any dropped kerb before we agree a price.
Dig out
The old surface and soil come out to the depth the ground needs, with spoil removal from site.
Lay the membrane
A geotextile membrane then goes down to keep the sub-base separate from the soil.
Build the sub-base
MOT Type 1 or open-graded stone goes in, laid in layers and compacted with a plate or roller.
Set the edges
We set block or steel edging in concrete, so the resin has something to lock against.
Lay the base
A new permeable base goes down, or we prepare sound existing tarmac or concrete.
Mix and trowel
We mix dried aggregate with clear resin and trowel it by hand to an even finish.
Cure and hand over
The surface is left to cure, and we tell you when it can take a car.
Resin, Block Paving, Tarmac or Gravel
Resin bound and block paving both stand up well to winter when the base underneath is right. Tarmac suits long drives and larger areas, while gravel is the simplest surface to lay and to top up.
| Option | What it involves | Strengths | Upkeep after | Best suited to |
|---|---|---|---|---|
| Resin boundPermeable | Dried aggregate mixed with clear resin and trowelled onto a solid base. | Smooth, with no loose stone, and rainwater drains through. | A sweep and a low-pressure wash. | Front driveways, paths and patios. |
| Block pavingHard-wearing | Concrete, clay or stone blocks on sharp sand over a compacted sub-base. | Carries heavy use and can be lifted and relaid. | Joints topped up with sand and kept free of weeds. | Busy drives and patterns such as herringbone. |
| TarmacLarger areas | Laid hot in a base course and a wearing course over a stone sub-base. | A dense, even finish over a large area. | Cracks sealed early, before water gets in. | Long drives and larger areas. |
| GravelMost permeable | Stone over a compacted base, a membrane and a stabilisation grid. | Fully permeable and the simplest surface to lay. | Raked level and topped up now and again. | Rural drives and side parking. |
Resin Bonded, Gravel and Drainage Channels

With resin bound gravel, we mix the stone and resin before laying, so the finish is smooth and water drains through it. Resin bonded gravel is loose stone scattered onto resin, so it is rougher and does not drain.

Gravel driveways go down over a compacted base and membrane, with timber sleepers or another solid edge holding the stone. A stabilisation grid keeps the driveway stones firm under tyres and stops them spreading onto the path.

A driveway drainage channel, also called a trench drain, catches water where the surface falls towards the house or garage. It sits in a concrete bed, and the grating needs clearing of leaves before the winter.
Not sure which driveway suits your home?
We look at the levels, the drainage and the ground on a free site visit, then recommend the surface that will last.
Planning Rules and Dropped Kerbs
A new front driveway can need planning permission if the surface does not let water through and the rainwater runs onto the road. Resin bound, permeable block paving and gravel do not need it, and neither does a surface that drains within the property.
The government guidance on permeable surfacing of front gardens sets out the rule in full. A new or wider dropped kerb also needs consent from Lincolnshire County Council, or North Lincolnshire Council in Scunthorpe.
How long a driveway lasts is decided by the excavation, the sub-base and the drainage underneath it.
Reshape Landscaping Ltd, LincolnRecent projects
RECENT DRIVEWAY WORK





Repairing a Winter-Damaged Driveway
Sunken block paving can usually be lifted, the bedding made good and the same blocks relaid. Cracked resin or tarmac is a bigger job, because the crack usually starts in the base.
Where the base has failed, relaying the surface makes more sense than patching, which can show against the original colour. Our guide to choosing a block paving driveway covers blocks in more detail.
Explore the rest of what we do
What to Ask Before a New Driveway Goes In
Ask driveway contractors what depth of sub-base they are pricing and what it is made of. Check how the surface will drain, where the falls run and if a channel drain or soakaway is included.
For resin bound driveways in Lincoln, also ask if the resin is UV stable and what base it will be laid on. If a contractor skips any of these points, ask what they are leaving out and why. To arrange a site visit with resin driveway installers in Lincoln, contact us.
WHY HOMEOWNERS PICK US
We are a British-owned and run landscaping company based in Lincoln, covering the city, Gainsborough, Scunthorpe, Sleaford and the surrounding areas.
- Established in 2010, with over 400 completed projects.
- Prestige Awards 2026 – Landscaper of the Year, Lincolnshire.
- Houzz 2026 Best of Service award, judged on customer feedback.
- Midlands Enterprise Awards 2026 – Best Bespoke Garden Landscaping Service, Lincolnshire.
- Approved installers for Talasey Landscaping Solutions and Select Living Group.
- Helped design and build a Japanese-inspired garden featured on ITV’s Best of Gardens.
- Qualified through the National Design Academy.
- Insured, including public liability.
Driveways: Frequently Asked Questions
Can you lay resin driveways in winter?
Yes, on dry days above the resin maker’s minimum temperature. Frost or a damp base stops it curing correctly.
What are the downsides of resin driveways?
Resin follows any movement in the base, so a weak base cracks through. Resin that is not UV stable can also discolour.
Can I jet wash a resin drive?
Yes, on a low setting with the nozzle held back. A stiff brush also shifts most moss and dirt.
Do I need permission for a new driveway?
Not if it is permeable or drains within the property. However, a dropped kerb needs council consent.
Is resin better than block paving?
Both last when the base is right. However, resin drains through, while you can lift and relay blocks.
What is the difference between resin bound and resin bonded?
Resin bound gravel goes down mixed and trowelled, so it drains. By contrast, resin bonded is loose stone on resin and does not drain.
Areas We Cover
We lay resin, block paving, tarmac and gravel driveways in Lincoln, Gainsborough, Scunthorpe, Sleaford and the surrounding areas. Resin bound driveways in Lincoln are covered on our resin driveway installers page, and blocks on the block paving in Lincoln page. We also lay resin driveways in Gainsborough, resin driveways in Sleaford and driveways in Scunthorpe.
Book Your Free Site Visit
If a driveway has sunk, cracked or holds water after rain, use the quote form or call us to arrange a site visit. Our driveways page covers the full service, and the Reshape blog has more guides on looking after a garden through the year. We reply to every enquiry within 48 hours.
Keep reading
Get a Free Quote
We install resin driveways, block paving and full gardens in Lincoln, Gainsborough and across Lincolnshire.